Official summary
What is being procured?
The procurement shall cover the need for ticket sales and information desks and lockers at the Viking Age Museum. The procurement concerns engineering design, production and establishment of an integrated information counter and changing rooms as part of an ongoing construction project, including necessary construction works, building floors, integration and assembly at the construction site. The information counter shall be a central part of the former Oseberg wing of the existing building, now Vestibylen, which becomes a central point of contact for the public on the way both in and out of the museum. Changing rooms for the public shall be placed over three floors, in the former Oseberg wing in the existing building.…
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 679882-2026. Checked on Oct 2, 2026, 2:05 AM.
https://ted.europa.eu/en/notice/-/detail/679882-2026
Analyse this notice with AI
Understand this notice: a summary, deadlines and points to check, based on the available information.
Notice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 679882-2026. Checked on Oct 2, 2026, 2:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.