Official summary
What is being procured?
The aim of the procurement is to enter into contract for upgrading the administration building in the form of two storey additions and alterations/renovations of the existing three floors. A comprehensive description of the delivery is given in the requirement specification (Annex 1). The assignment shall be executed as a general contract. The body on the 4th floor shall contain a laboratory and office landscape. The 5th floor addition includes a canteen, meeting room and auditorium. The basement floor shall have expanded changing rooms capacity, a new escape route and a new toilet and wet room system. The first and second floors shall be modernised to a new office landscape in addition to new toilets and wet rooms.…
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 668948-2026. Checked on Sep 29, 2026, 10:05 AM.
https://ted.europa.eu/en/notice/-/detail/668948-2026
Analyse this notice with AI
Understand this notice: a summary, deadlines and points to check, based on the available information.
Notice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 668948-2026. Checked on Sep 29, 2026, 10:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.