Official summary
What is being procured?
The project involves the replacement/rehabilitation of a single-span road bridge in poor structural condition and has partially collapsed. Works will focus on the replacement of bridge deck and parapet walls, abutment and wingwall re-pointing, vegetation clearance, and associated ancillary works. Shesknan Bridge is a single-span masonry arch bridge of approximately 6m span, supporting a local road crossing over a natural watercourse. The bridge consists of a masonry arch barrel, stone sidewalls and parapets, with a relatively shallow depth of fill material supporting the road surface above. The recommended solution for the bridge is full replacement. This addresses advanced deterioration including reinforcement corrosion, section loss and spalling, which render repair-only strategies uneco
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 652503-2026. Checked on Sep 22, 2026, 7:05 AM.
https://ted.europa.eu/en/notice/-/detail/652503-2026
Analyse this notice with AI
Understand this notice: a summary, deadlines and points to check, based on the available information.
Notice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 652503-2026. Checked on Sep 22, 2026, 7:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.