Analyse this notice with AI
Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Sign in to analyseNotice and PDF analyses use the same allowance.
Official summary
What is being procured?
VAV needs to enter into a new framework agreement for inspecting street foundations and facades. The contract will include set-up of vibration meters as well as site inspections of houses. Street foundations and facades shall be inspected for several projects, both before and after the execution of projects. Damage to the road foundation and property shall be documented in such assignments, resulting from blasting, pigging etc. In individual cases vibration meters will be set out in periods where work is being carried out. VAV shall enter into a framework agreement with one tenderer, but the contract is non-exclusive. The contracting authority has the right, but not an obligation, to procure services covered by the Framework Agreement, within the scope and length of the framework agreement
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 640894-2026. Checked on Sep 17, 2026, 11:05 AM.
https://ted.europa.eu/en/notice/-/detail/640894-2026
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 640894-2026. Checked on Sep 17, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.