Official summary
What is being procured?
The procurement includes the replacement of existing mechanical locks, as well as delivery, installation, commissioning of a new and complete electronic locking system, including lock cylinders, digital keys and the accompanying access control administration system. A framework agreement shall be signed with one tenderer for a period of two years, with an option for an extension for 1+1 year, so that the maximum total contract period is four years. Product The estimated need for the entire framework agreement period is 600-800 lock cylinders and 15-20 keys. The key system can either be based on physical keys or digital access via the app, depending on the offered system. The contracting authority plans to make a first call-off immediately after the contract has been signed. This call-off i
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 640675-2026. Checked on Sep 17, 2026, 11:05 AM.
https://ted.europa.eu/en/notice/-/detail/640675-2026
Analyse this notice with AI
Understand this notice: a summary, deadlines and points to check, based on the available information.
Notice and PDF analyses use the same allowance.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 640675-2026. Checked on Sep 17, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.