Official summary
What is being procured?
The international research facility FAIR (Facility for Antiproton and Ion Research) is currently under construction at the GSI Helmholtz Centre for Heavy Ion Research. This project requires numerous different types of detectors for beam diagnostics, including ionization chambers and secondary electron emission monitors. A key component of the design for these detector types is the current-to-frequency converter (IFC), which is used to measure current signals in the nano- and microampere range. The required systems are distributed across the various accelerator facilities on the FAIR campus. Prototype versions of the IFCs have been in use at GSI for some time.…
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 636658-2026. Checked on Sep 16, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.