Official summary
What is being procured?
The 24.5 km long Lærdal tunnel on the E16 between Aurland and Lærdal in Vestland county shall be upgraded. The tunnel does not meet all requirements in the Tunnel Safety Regulations, and the requirements for electricity safety have changed since the tunnel was opened in 2000. Comprehensive measures must be implemented so that the tunnel shall meet the current standard requirements. New breakdown lay-bys, turning sections and new technical buildings shall be blasted for approx. each km. 28 new technical buildings shall be in place, two of these in the open air. A new ventilation tunnel shall also be blasted next to the old one. The old shaft ventilators in a cross section shall be replaced and two new shaft ventilators shall be installed. All technical equipment shall be replaced and upgrad
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 629344-2026. Checked on Sep 14, 2026, 11:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.