Open TED · Source · Language: Français

Belgium · Construction work

Official title · Français

Framework Agreement for the Assessment, Design, Supply, Installation and Commissioning of Rooftop Solar PV Systems with Battery Energy Storage Systems for Schools

Enabel · Belgium

View notices under this name
Deadline Oct 9, 2026 15:00 UTC+02:00
Estimated valueNot announced
PublishedSep 10, 2026
Open official notice ↗

Official summary · Français

What is being procured?

Supply of solar photovoltaic (PV) modules for the installation of rooftop hybrid solar power systems with Battery Energy Storage Systems (BESS) at schools in Kyiv Oblast, Ukraine, under a framework agreement (1–50 kW, 51–100 kW, and 101–150 kW installed capacity respectively)

Preparation checklist

Prepare my response

Checks to carry out in the official documents. This guide is not an automated document analysis.

  1. Read the complete documents and amendments
  2. Check participation conditions and required documents
  3. Check whether a site visit or meeting is required
  4. Review award criteria and their weighting
  5. Check available resources, budget and schedule
  6. Confirm the submission process and deadline

TED · 623730-2026. Checked on Sep 11, 2026, 8:06 AM.
https://ted.europa.eu/fr/notice/-/detail/623730-2026

Sign in →

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

  1. Competition notice

    · TED 613767-2026

    Open official notice ↗
  2. Correction notice Current notice

    · TED 623730-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 623730-2026. Checked on Sep 11, 2026, 8:06 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email