Official summary
What is being procured?
The construction project concerns the refurbishment of the building envelope at Hovedstadens Beredskab Teknik and will be carried out in five phases. Phases 1–3 (fixed works): Replacement of the roof covering, installation of internal insulation and external condensation insulation. Replacement of ridge lights. Refurbishment and partial replacement of facade windows. Minor brickwork repairs. Installation of photovoltaic panels. Phase 4 (option): Replacement of the roof, including sub‑roof boards, and installation of external condensation insulation. Refurbishment of skylights. Window and brickwork refurbishment. The option will be activated subject to sufficient budget availability. Phase 5 (option): Brickwork refurbishment along the boundary to Vestre Fængsel, from Enghavevej 85 to Vigers
Preparation checklist
Prepare my response
Checks to carry out in the official documents. This guide is not an automated document analysis.
- Read the complete documents and amendments
- Check participation conditions and required documents
- Check whether a site visit or meeting is required
- Review award criteria and their weighting
- Check available resources, budget and schedule
- Confirm the submission process and deadline
TED · 615209-2026. Checked on Sep 10, 2026, 6:05 AM.
https://ted.europa.eu/en/notice/-/detail/615209-2026
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 615209-2026. Checked on Sep 10, 2026, 6:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.