Official summary
What is being procured?
The Joint Research Center (JRC) of the European Commission wishes to equip their site, located at Retieseweg 111, 2440 Geel, Belgium, with a photovoltaic installation (PV). The aim of this installation to conform with the upcoming PV obligation set out by the Flemish government and to maximize the yield with the available surfaces. The produced energy will be maximally consumed locally. The scope of this tender includes the design, supply, installation, and commissioning of the PV installation. The installation to be placed must have a minimum capacity of 675 kWp and must be designed according to the specifications made available during tendering period.
Free
Get the next tenders in this sector
Receive new notices matching your criteria in a weekly email. Check or adjust your criteria before activating your free alert.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 612806-2026. Checked on Sep 10, 2026, 5:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.