Awarded TED · Source

Ireland · Construction work

Official title · English

Establishment of a Multi Supplier Framework of Specialist Contractors for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade.

University College Cork · Ireland

View notices under this name
Official summary

UCC hereby issues this information in accordance with the requirements of EC directive 2014/24/EU for Establishment of a Multi Supplier Framework of Specialist Contractors using the Open Procedure for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade. The initial contract comprise works to the Boole Library which is currently heated from the main campus district heating system. There are 2no. 300 kW chillers on the…

What is being procured?
Deadline Not announced
Estimated value4,500,000 EUR
PublishedAug 28, 2026
Open official notice ↗

Official summary

What is being procured?

UCC hereby issues this information in accordance with the requirements of EC directive 2014/24/EU for Establishment of a Multi Supplier Framework of Specialist Contractors using the Open Procedure for HVAC Installations at UCC and Contract for UCC Boole Special Collections Chiller Upgrade. The initial contract comprise works to the Boole Library which is currently heated from the main campus district heating system. There are 2no. 300 kW chillers on the roof which were sized for comfort cooling via the library AHUs, however these are not used for that purpose. The Special Collections area in Q-1 houses rare and important books and artifacts, which need to be maintained at a certain temperature and humidity of approximately 18 degrees and 55 percent relative humidity. In order to dehumidify

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Current notice

    · TED 596014-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 596014-2026. Checked on Aug 31, 2026, 11:05 AM.