Framework agreement for electrician services and electrical materials.

Vennesla kommune · Norway

View notices under this name
Official summary

Background Vennesla municipality needs to renew the existing contract for electrician services and electrical material. The municipality has some electro competence, but it does not cover the total need for ongoing assignments, acute events, stand-by and assignments that require special professional competence. The objective of the procurement is to ensure the municipality predictable access to external assistance for work in municipal buildings and on…

What is being procured?
Deadline Sep 30, 2026 12:00 UTC+02:00
Estimated value16,000,000 NOK
PublishedAug 27, 2026
Open official notice ↗

Official summary

What is being procured?

Background Vennesla municipality needs to renew the existing contract for electrician services and electrical material. The municipality has some electro competence, but it does not cover the total need for ongoing assignments, acute events, stand-by and assignments that require special professional competence. The objective of the procurement is to ensure the municipality predictable access to external assistance for work in municipal buildings and on technical installations. The framework agreement shall contribute to the necessary work being carried out with the correct capacity, availability and quality and at the same time give the municipality flexibility in connection with work stoppages, absence and operational critical situations.…

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Competition notice Notice being viewed

    · TED 593257-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 593257-2026. Checked on Aug 28, 2026, 9:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email