Open TED · Source · Language: Français

France · Architectural, construction, engineering and inspection services

Official title · Français

Mission de maîtrise d'oeuvre visant la réalisation de travaux de confortement de la Contre-Seille sur la commune de Bédarrides (84)

Syndicat Mixte de l'Ouvèze Provençale · France

View notices under this name

Official summary · Français

What is being procured?

Le marché a pour objet la réalisation d'une mission de maîtrise d'oeuvre visant la réalisation des travaux de confortement de la Contre-Seille sur la commune de Bédarrides (84). La mission est composée d'une tranche ferme et de trois tranches optionnelles

Deadline Oct 16, 2026 12:00 UTC+02:00
Estimated value260,000 EUR
PublishedAug 26, 2026
View notice Analyse this notice with AI Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Open official notice ↗

Preparation checklist

Prepare my response

Checks to carry out in the official documents. This guide is not an automated document analysis.

  1. Read the complete documents and amendments
  2. Check participation conditions and required documents
  3. Check whether a site visit or meeting is required
  4. Review award criteria and their weighting
  5. Check available resources, budget and schedule
  6. Confirm the submission process and deadline

TED · 590031-2026. Checked on Aug 28, 2026, 11:05 AM.
https://ted.europa.eu/fr/notice/-/detail/590031-2026

Sign in →
Analyse PDF tender documents

Notice and PDF analyses use the same allowance.

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Competition notice Current notice

    · TED 590031-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 590031-2026. Checked on Aug 28, 2026, 11:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email