Official summary
What is being procured?
CONSTRUCTION OF 30 NO. 3-BEDROOM 6-PERSON 3-STOREY HOUSES, 4 NO. 2-BEDROOM, 4 PERSON, 2 STOREY HOUSES, 6 NO. 3-BEDROOM, 5- PERSON, DUPLEX APARTMENTS, 6 NO. 2-BEDROOM, 4 PERSON DUPLEX APARTMENTS AND 18 NO. 1-BEDROOM, 2-PERSON APARTMENTS. 64 IN TOTAL. THE DEVELOPMENT WILL INCLUDE ALL NECESSARY SITE CLEARANCE, REMOVAL OF SELECTED EXISTING TREES AND SHRUBS AND ASSOCIATED SITE AND CIVIL WORKS; BULK EXCAVATION TO REDUCE SITE LEVELS GENERALLY; REDISTRIBUTION OF MATERIAL EXCAVATED FROM SITE AND REMOVAL OF MATERIAL EXCAVATED FROM SITE TO A LICENCED LANDFILL FACILITY BY A LICENCED HAULAGE CONTRACTOR; REMOVAL AND SEGREGATION OF MIXED DEBRIS, WASTE AND RUBBLE FROM THE WORKS TO A LICENCED RECYCLING / LANDFILL FACILITY BY A LICENCED HAULAGE CONTRACTOR; REMOVAL OF INERT SOIL AND ROCK MATERIAL EXCAVATED…
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 565375-2026. Checked on Aug 24, 2026, 6:05 PM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.