Opportunity summary
What is being procured?
Ørsted are planning for a new frame agreement with bi-annual ROV inspection with planned call-offs in 2027-2029-2031 optional 2033, but not limited to call-off in these specific years. The ROV IRM scope will be at the two Ørsted owned and operated 24” and 30” offshore gas pipelines including subsea structures, risers and spools and the 20” offshore oil pipeline. 2.3.5 Inspection services. Contractor shall perform inspections including but not limited to: IRM ROV inspection work according to Ørsted, inspections Sheets, Visual Inspection, CP stabbing, Cleaning of Marine Growth. And optional but not limited to scope for: Removal of seabed objects, Flooded member detection (FMD), FIGS pipeline and structure CP task, Other ROV task. Please note, that above scope is preliminary and a subject of
Source and reliability
Source: official TED notice 558609-2026, last checked Aug 21, 2026, 8:08 PM. The original publication remains authoritative.
Data is restructured for easier reading. The official notice and procurement documents always prevail.