Closed TED · Source

Iceland · Construction work

Official title · English

HVM36 - Penstocks

Landsvirkjun · Iceland

View notices under this name
Official summary

The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services…

What is being procured?
Deadline Sep 3, 2026 14:00 UTC
Estimated valueNot announced
PublishedJul 20, 2026
Open official notice ↗

Official summary

What is being procured?

The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services required to provide a complete, satisfactory and fully operational installation. The scope shall include, but not be limited to, the penstocks with flow measurement systems and all related mechanical, electrical and instrumentation work necessary for the proper and reliable operation of the penstocks.…

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Correction notice Notice being viewed

    · TED 498894-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 498894-2026. Checked on Aug 23, 2026, 7:05 PM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email