Closed TED · Source

Malta · Construction work

Official title · English

RAM/001/2025 Pre-Qualification Questionnaire (PQQ) for the Award of a Concession for the Design, Build, Finance, Operate and Transfer Back of a National Farm Waste Treatment Facility

Rizorsi Agrikoli Malta · Malta

View notices under this name
Official summary

The Contracting Authority seeks to establish a Concession Contract for the Design, Build, Finance, Operate, and Transfer back (DBFOT) of a national farm waste treatment facility for the collection and processing of animal waste (manure and slurry) into renewable energy and organic soil enhancers (National Farm Waste Treatment Facility – NFWTF). The primary objective for NFWTF is to handle and process the animal farm manure/slurry in a sustainable and…

What is being procured?
Deadline Not announced
Estimated value511,000,000 EUR
PublishedJun 29, 2026
Open official notice ↗

Official summary

What is being procured?

The Contracting Authority seeks to establish a Concession Contract for the Design, Build, Finance, Operate, and Transfer back (DBFOT) of a national farm waste treatment facility for the collection and processing of animal waste (manure and slurry) into renewable energy and organic soil enhancers (National Farm Waste Treatment Facility – NFWTF). The primary objective for NFWTF is to handle and process the animal farm manure/slurry in a sustainable and acceptable way. The intention is to transform manure/slurry (and potentially other agricultural waste) into valuable by-products, such as renewable energy (e.g., biofuels), food-grade CO2, and organic soil enhancers (e.g., biofertilizers). The successful Tenderer will be awarded the concession contract for the Design, Build, Finance, Operate,

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Current notice

    · TED 443534-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 443534-2026. Checked on Aug 23, 2026, 9:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email