What is being procured?
Design, manufacturing, delivery, installation and commissioning of a cryogenic supply system to supply liquid hydrogen from a tank to up to four (4) test positions. • Pipeline Types: o Cryogenic Pipeline: Vacuum-insulated, DN40 PN16, approx. 110m in length o Cryogenic Transfer Pipeline (optional): Vacuum-insulated, DN25 PN16, approx. 120m in length o Cryogenic Exhaust Pipeline to Flare: Non-insulated, DN250 PN16, approx. 110m in length o Cryogenic Distribution Panel: Vacuum-insulated, primarily DN40 PN16, central distribution panel with purge functions and flow measurement o 3 (+1 optional) Panels at the Test Position: Vacuum-insulated, primarily DN40 PN16, compact panel with purge function and shut-off at the test site o Purge Lines for Helium and Nitrogen: Extending up to the panel…
Machine translation for guidance. The official summary remains authoritative.
Official summary · Deutsch
Design, manufacturing, delivery, installation and commissioning of a cryogenic supply system to supply liquid hydrogen from a tank to up to four (4) test positions. • Pipeline Types: o Cryogenic Pipeline: Vacuum-insulated, DN40 PN16, approx. 110m in length o Cryogenic Transfer Pipeline (optional): Vacuum-insulated, DN25 PN16, approx. 120m in length o Cryogenic Exhaust Pipeline to Flare: Non-insulated, DN250 PN16, approx. 110m in length o Cryogenic Distribution Panel: Vacuum-insulated, primarily DN40 PN16, central distribution panel with purge functions and flow measurement o 3 (+1 optional) Panels at the Test Position: Vacuum-insulated, primarily DN40 PN16, compact panel with purge function and shut-off at the test site o Purge Lines for Helium and Nitrogen: Extending up to the panel…
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 386643-2026. Checked on Aug 22, 2026, 6:05 PM.