The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 671039-2026. Kontrollerad 30 sep. 2026 11:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.