Resumo oficial · English
O que está a ser adquirido?
The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.
Tradução automática indicativa. O resumo oficial continua a ser a referência.
Resumo oficial · English
The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.
Histórico do anúncio
Cronologia do procedimento de contratação pública
Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.
Ainda não foi identificado nenhum outro anúncio relacionado.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.
Fonte e fiabilidade
TED · 671039-2026. Verificado em 30 de set de 2026 11:05.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.