Službeni sažetak · English
Što se nabavlja?
The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 671039-2026. Provjereno 30. ruj 2026. 11:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.