Officiell sammanfattning · English
Vad upphandlas?
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage inf
Källa och tillförlitlighet
Källa: officiellt TED-meddelande 570354-2026, senast kontrollerat 21 aug. 2026 21:06. Originalpubliceringen är fortsatt styrande.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.