Sintesi ufficiale · English
Che cosa viene acquistato?
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage inf
Fonte e affidabilità
Fonte: avviso TED ufficiale 570354-2026, verificato l’ultima volta il 21 ago 2026, 21:06. La pubblicazione originale resta il riferimento.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.