Iespējas kopsavilkums
Kas tiek iepirkts?
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage inf
Avots un uzticamība
Avots: oficiālais TED paziņojums 570354-2026, pēdējā pārbaude 2026. gada 21. aug. 21:06. Noteicošā ir sākotnējā publikācija.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.