Officiell sammanfattning · English
Vad upphandlas?
The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.
Källa och tillförlitlighet
Källa: officiellt TED-meddelande 544122-2026, senast kontrollerat 21 aug. 2026 20:06. Originalpubliceringen är fortsatt styrande.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.