Otvoreno Izvor · Jezik: English

Hrvatska · Građevinski radovi

Službeni predmet · English

Rehabilitation of water supply pipelines; construction of the Skrad public sewer system

KD VODOVOD I KANALIZACIJA d. o. o. · Hrvatska

Rok 1. ruj 2026. 07:30 UTC
Procijenjena vrijednostNije objavljeno
Objavljeno6. kol 2026.
Otvori službenu obavijest ↗

Službeni sažetak · English

Što se nabavlja?

The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

Izvor i pouzdanost

Izvor: službena TED obavijest 544122-2026, zadnji put provjerena 21. kol 2026. 20:06. Izvorna objava ostaje mjerodavna.

Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.