Avatud Allikas · Keel: English

Horvaatia · Ehitustööd

Ametlik teema · English

Rehabilitation of water supply pipelines; construction of the Skrad public sewer system

KD VODOVOD I KANALIZACIJA d. o. o. · Horvaatia

Tähtaeg 1. sept 2026 07:30 UTC
Eeldatav maksumusTeatamata
Avaldatud6. aug 2026
Ava ametlik teade ↗

Ametlik kokkuvõte · English

Mida hangitakse?

The rehabilitation of water supply pipelines in the zone of construction of the Skrad public sewer system and construction of the Skrad public sewer system includes the construction of a sewer system of the Skrad agglomeration through the construction of sanitary sewers in the length of 3,580 m, 964 m of pressure lines with four supporting pumping stations, and rehabilitation of 1,616 m of water supply pipelines with supporting shafts and fittings; the preparation of implementation designs, as-built survey, as-built reports and supporting documents required for the performance of works and issuance of Use Permits.

Allikas ja usaldusväärsus

Allikas: ametlik TEDi teade 544122-2026, viimati kontrollitud 21. aug 2026 20:06. Määravaks jääb algne väljaanne.

Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.