1. Background and purpose The project includes completion of ongoing construction work on county road 60 between Blindheim and Flisnes, after the former contractor has gone bankrupt. The aim of the project is to complete planned traffic safety measures and ensure that the facility is completed in accordance with the approved plans and technical requirements. County road 60 is an important main thoroughfare in the area, both as a local access road and as a thoroughfare to the ferry route Magerholm–Sykkylven. The road section has an annual daily traffic (ÅDT) of approx.…
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
1. Background and purpose The project includes completion of ongoing construction work on county road 60 between Blindheim and Flisnes, after the former contractor has gone bankrupt. The aim of the project is to complete planned traffic safety measures and ensure that the facility is completed in accordance with the approved plans and technical requirements. County road 60 is an important main thoroughfare in the area, both as a local access road and as a thoroughfare to the ferry route Magerholm–Sykkylven. The road section has an annual daily traffic (ÅDT) of approx.…
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 367057-2026. Kontrollerad 22 aug. 2026 15:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.