Officiële samenvatting · English
Wat wordt ingekocht?
1. Background and purpose The project includes completion of ongoing construction work on county road 60 between Blindheim and Flisnes, after the former contractor has gone bankrupt. The aim of the project is to complete planned traffic safety measures and ensure that the facility is completed in accordance with the approved plans and technical requirements. County road 60 is an important main thoroughfare in the area, both as a local access road and as a thoroughfare to the ferry route Magerholm–Sykkylven. The road section has an annual daily traffic (ÅDT) of approx.…
Machinevertaling ter ondersteuning. De officiële samenvatting blijft leidend.
Officiële samenvatting · English
1. Background and purpose The project includes completion of ongoing construction work on county road 60 between Blindheim and Flisnes, after the former contractor has gone bankrupt. The aim of the project is to complete planned traffic safety measures and ensure that the facility is completed in accordance with the approved plans and technical requirements. County road 60 is an important main thoroughfare in the area, both as a local access road and as a thoroughfare to the ferry route Magerholm–Sykkylven. The road section has an annual daily traffic (ÅDT) of approx.…
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
Er is nog geen andere gerelateerde aankondiging gevonden.
-
Rectificatie Bekeken aankondiging
· TED 367057-2026
Gewijzigde rubrieken: 2 Officiële aankondiging openen ↗
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.
Bron en betrouwbaarheid
TED · 367057-2026. Gecontroleerd op 22 aug. 2026 15:05.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.