1. Background and purpose The project includes completion of ongoing construction work on county road 60 between Blindheim and Flisnes, after the former contractor has gone bankrupt. The aim of the project is to complete planned traffic safety measures and ensure that the facility is completed in accordance with the approved plans and technical requirements. County road 60 is an important main thoroughfare in the area, both as a local access road and as a thoroughfare to the ferry route Magerholm–Sykkylven. The road section has an annual daily traffic (ÅDT) of approx.…
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
1. Background and purpose The project includes completion of ongoing construction work on county road 60 between Blindheim and Flisnes, after the former contractor has gone bankrupt. The aim of the project is to complete planned traffic safety measures and ensure that the facility is completed in accordance with the approved plans and technical requirements. County road 60 is an important main thoroughfare in the area, both as a local access road and as a thoroughfare to the ferry route Magerholm–Sykkylven. The road section has an annual daily traffic (ÅDT) of approx.…
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
-
Obavijest o ispravku Obavijest koju pregledavate
· TED 367057-2026
Izmijenjeni odjeljci: 2 Otvorite službenu obavijest ↗
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 367057-2026. Provjereno 22. kol 2026. 15:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.