Uradni povzetek · English
Kaj je predmet naročila?
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the num
Informativni strojni prevod. Uradni povzetek ostaja merodajen.
Uradni povzetek · English
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the num
Brezplačno
Prejemajte prihodnje razpise v tej dejavnosti
Vsak teden prejmite e-pošto z novimi obvestili, ki ustrezajo vašim merilom. Pred vklopom brezplačnega opozorila merila preverite ali prilagodite.
Pripravljalni seznam
Pripravi mojo ponudbo
Točke za preverjanje v uradni dokumentaciji. Vodnik ni samodejna analiza dokumentacije.
- Preberite vso dokumentacijo in spremembe
- Preverite pogoje sodelovanja in zahtevane dokumente
- Preverite ali je potreben ogled ali sestanek
- Preglejte merila za oddajo in njihove uteži
- Preverite razpoložljive vire, proračun in časovnico
- Potrdite postopek in rok oddaje
TED · 650524-2026. Preverjeno 22. sep. 2026 11:05.
https://ted.europa.eu/en/notice/-/detail/650524-2026
Analiziraj to obvestilo z UI
Spoznajte bistvo: povzetek, roke in točke za preverjanje na podlagi razpoložljivih informacij.
Analize obvestil in datotek PDF uporabljajo isto kvoto.
Zgodovina obvestil
Časovnica postopka javnega naročanja
Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.
Za zdaj ni bilo najdeno nobeno drugo povezano obvestilo.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.
Vir in zanesljivost
TED · 650524-2026. Preverjeno 22. sep. 2026 11:05.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.