Ametlik kokkuvõte · English
Mida hangitakse?
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the num
Abistav masintõlge. Ametlik kokkuvõte jääb määravaks.
Ametlik kokkuvõte · English
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the num
Tasuta
Saage selle valdkonna järgmised hanked
Saate kord nädalas e-kirja uute teadetega, mis vastavad teie tingimustele. Enne tasuta teavituse aktiveerimist kontrollige või muutke tingimusi.
Ettevalmistuse loend
Valmista minu pakkumus ette
Ametlikest dokumentidest kontrollitavad punktid. Juhend ei ole automaatne dokumendianalüüs.
- Loe kõiki dokumente ja muudatusi
- Kontrolli osalemistingimusi ja nõutud dokumente
- Kontrolli kas nõutakse külastust või koosolekut
- Vaata hindamiskriteeriume ja nende osakaale
- Kontrolli ressursse, eelarvet ja ajakava
- Kinnita esitamise kord ja tähtaeg
TED · 650524-2026. Kontrollitud 22. sept 2026 11:05.
https://ted.europa.eu/en/notice/-/detail/650524-2026
Analüüsi seda teadet tehisintellektiga
Mõistke olulist: kokkuvõte, tähtajad ja kontrollitavad punktid olemasoleva teabe põhjal.
Teadete ja PDF-ide analüüsid kasutavad sama kvooti.
Teate ajalugu
Hankemenetluse ajajoon
Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.
Ühtegi muud seotud teadet ei ole veel tuvastatud.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.
Allikas ja usaldusväärsus
TED · 650524-2026. Kontrollitud 22. sept 2026 11:05.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.