Officielt resumé · English
Hvad indkøbes?
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the num
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the num
Gratis
Få de næste udbud i denne branche
Modtag en ugentlig e-mail med nye bekendtgørelser, der matcher dine kriterier. Tjek eller tilpas kriterierne, før du aktiverer din gratis besked.
Forberedelsesliste
Forbered mit tilbud
Kontroller i de officielle dokumenter. Denne vejledning er ikke en automatisk dokumentanalyse.
- Læs alle dokumenter og ændringer
- Kontrollér deltagelsesbetingelser og krævede dokumenter
- Kontrollér om besøg eller møde er påkrævet
- Gennemgå tildelingskriterier og vægtning
- Kontrollér tilgængelige ressourcer, budget og tidsplan
- Bekræft indsendelsesprocedure og frist
TED · 650524-2026. Kontrolleret 22. sep. 2026 11.05.
https://ted.europa.eu/en/notice/-/detail/650524-2026
Analysér denne bekendtgørelse med AI
Forstå det vigtigste: resumé, frister og punkter til gennemgang ud fra de tilgængelige oplysninger.
Analyser af bekendtgørelser og PDF’er bruger samme kvote.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 650524-2026. Kontrolleret 22. sep. 2026 11.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.