Oficiálne zhrnutie · English
Čo je predmetom obstarávania?
• Remove existing heating services and plant as indicated on the contract drawings. • Install new plant, pipework and ancillaries as per the contract drawings including: o New Heat pumps o Pipework and headers o Pumps o Pressurization unit o Buffer Vessel o Valves, motorized valves and ancillaries o Water pressurization set • Supply and install new LPHW distribution pipework as per contract drawings. • Supply and install any controls associated with the heat pumps, pressurization unit, etc. • Supply and install radiators and radiator control valves as specified throughout • Test and commission and certify the new system • Supply and install new heating control panels and field devices and test and commission system The contractor shall liaise with the client to agree time schedules for hea
Zdroj a spoľahlivosť
Zdroj: oficiálne oznámenie TED 585971-2026, naposledy overené 25. 8. 2026, 3:05. Rozhodujúce zostáva pôvodné zverejnenie.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.