Offizielle Zusammenfassung · English
Was wird beschafft?
• Remove existing heating services and plant as indicated on the contract drawings. • Install new plant, pipework and ancillaries as per the contract drawings including: o New Heat pumps o Pipework and headers o Pumps o Pressurization unit o Buffer Vessel o Valves, motorized valves and ancillaries o Water pressurization set • Supply and install new LPHW distribution pipework as per contract drawings. • Supply and install any controls associated with the heat pumps, pressurization unit, etc. • Supply and install radiators and radiator control valves as specified throughout • Test and commission and certify the new system • Supply and install new heating control panels and field devices and test and commission system The contractor shall liaise with the client to agree time schedules for hea
Quelle und Verlässlichkeit
Quelle: amtliche TED-Bekanntmachung 585971-2026, zuletzt geprüft am 25.08.2026, 03:05. Maßgeblich bleibt die Originalveröffentlichung.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.