Rezumat oficial · Svenska
Ce se achiziționează?
To participate in the tendering process, companies must qualify for each package they intend to bid on. It is possible to submit bids for one or both packages. It is possible to qualify different factories for package 1 and 2. Scope of Package 1: Bredäng – 500 MVA, 410/225 kV, 2 units Ellevio can only accepts a design of 3-limbed cores for the units in Bredäng. Scope of Package 2: Beckomberga – 500 MVA, 410/225 kV, 2 units Ellevio can accept both 3-limbed and 5-limbed cores for the units in Beckomberga. Delivery is scheduled for 2029.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · Svenska
To participate in the tendering process, companies must qualify for each package they intend to bid on. It is possible to submit bids for one or both packages. It is possible to qualify different factories for package 1 and 2. Scope of Package 1: Bredäng – 500 MVA, 410/225 kV, 2 units Ellevio can only accepts a design of 3-limbed cores for the units in Bredäng. Scope of Package 2: Beckomberga – 500 MVA, 410/225 kV, 2 units Ellevio can accept both 3-limbed and 5-limbed cores for the units in Beckomberga. Delivery is scheduled for 2029.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Nu a fost identificat încă niciun alt anunț asociat.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 558048-2026. Verificat la 24 aug. 2026, 17:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.