Oficiali santrauka · Svenska
Kas perkama?
To participate in the tendering process, companies must qualify for each package they intend to bid on. It is possible to submit bids for one or both packages. It is possible to qualify different factories for package 1 and 2. Scope of Package 1: Bredäng – 500 MVA, 410/225 kV, 2 units Ellevio can only accepts a design of 3-limbed cores for the units in Bredäng. Scope of Package 2: Beckomberga – 500 MVA, 410/225 kV, 2 units Ellevio can accept both 3-limbed and 5-limbed cores for the units in Beckomberga. Delivery is scheduled for 2029.
Informacinis mašininis vertimas. Oficialiai santraukai ir toliau teikiama pirmenybė.
Oficiali santrauka · Svenska
To participate in the tendering process, companies must qualify for each package they intend to bid on. It is possible to submit bids for one or both packages. It is possible to qualify different factories for package 1 and 2. Scope of Package 1: Bredäng – 500 MVA, 410/225 kV, 2 units Ellevio can only accepts a design of 3-limbed cores for the units in Bredäng. Scope of Package 2: Beckomberga – 500 MVA, 410/225 kV, 2 units Ellevio can accept both 3-limbed and 5-limbed cores for the units in Beckomberga. Delivery is scheduled for 2029.
Skelbimo istorija
Pirkimo procedūros laiko juosta
Sekite pagrindinius šios pirkimo procedūros etapus ir atnaujinimus.
Kol kas nenustatyta jokių kitų susijusių skelbimų.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.
Šaltinis ir patikimumas
TED · 558048-2026. Patikrinta 2026-08-24 17:05.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.