Quel est l’objet du marché ?
To participate in the tendering process, companies must qualify for each package they intend to bid on. It is possible to submit bids for one or both packages. It is possible to qualify different factories for package 1 and 2. Scope of Package 1: Bredäng – 500 MVA, 410/225 kV, 2 units Ellevio can only accepts a design of 3-limbed cores for the units in Bredäng. Scope of Package 2: Beckomberga – 500 MVA, 410/225 kV, 2 units Ellevio can accept both 3-limbed and 5-limbed cores for the units in Beckomberga. Delivery is scheduled for 2029.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · Svenska
To participate in the tendering process, companies must qualify for each package they intend to bid on. It is possible to submit bids for one or both packages. It is possible to qualify different factories for package 1 and 2. Scope of Package 1: Bredäng – 500 MVA, 410/225 kV, 2 units Ellevio can only accepts a design of 3-limbed cores for the units in Bredäng. Scope of Package 2: Beckomberga – 500 MVA, 410/225 kV, 2 units Ellevio can accept both 3-limbed and 5-limbed cores for the units in Beckomberga. Delivery is scheduled for 2029.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 558048-2026. Vérifié le 24 août 2026 à 17:05.