Officiële samenvatting · English
Wat wordt ingekocht?
The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysis
Machinevertaling ter ondersteuning. De officiële samenvatting blijft leidend.
Officiële samenvatting · English
The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysis
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
Er is nog geen andere gerelateerde aankondiging gevonden.
De tijdlijn is samengesteld uit gekoppelde officiële TED-aankondigingen. De officiële documenten zijn leidend.
Bron en betrouwbaarheid
Bron: officiële TED-aankondiging 594507-2026, laatst gecontroleerd op 31 aug. 2026 10:05. De oorspronkelijke publicatie blijft gezaghebbend.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.