Oficiālais kopsavilkums · English
Kas tiek iepirkts?
The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysis
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysis
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Laika skala ir izveidota no savstarpēji saistītiem oficiālajiem TED paziņojumiem. Noteicošie ir oficiālie dokumenti.
Avots un uzticamība
Avots: oficiālais TED paziņojums 594507-2026, pēdējā pārbaude 2026. gada 31. aug. 10:05. Noteicošā ir sākotnējā publikācija.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.