Službeni sažetak · English
Što se nabavlja?
The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysis
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysis
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Vremenski slijed sastavljen je iz povezanih službenih TED obavijesti. Službena dokumentacija uvijek ima prednost.
Izvor i pouzdanost
Izvor: službena TED obavijest 594507-2026, zadnji put provjerena 31. kol 2026. 10:05. Izvorna objava ostaje mjerodavna.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.