Resumen oficial · English
¿Qué se contrata?
The Contracting Authority wants to purchase one 3 phase, 145 kV, 50 Hz, gas-insulated switchgear (GIS) Alternative gas, double busbar for substation Ølstykke (ØLS) and delivered on Energinet’s site, ready for operation. The GIS Switchgear will be installed in a new building - The supply consists of 2 line-feeder bays, 2 (two) transformer bays, 1 bus bar coupler bays, and 2 (two) metering bays.
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The Contracting Authority wants to purchase one 3 phase, 145 kV, 50 Hz, gas-insulated switchgear (GIS) Alternative gas, double busbar for substation Ølstykke (ØLS) and delivered on Energinet’s site, ready for operation. The GIS Switchgear will be installed in a new building - The supply consists of 2 line-feeder bays, 2 (two) transformer bays, 1 bus bar coupler bays, and 2 (two) metering bays.
Gratis
Reciba las próximas licitaciones de este sector
Reciba nuevos anuncios que coincidan con sus criterios en un correo semanal. Revise o ajuste los criterios antes de activar su alerta gratuita.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 564575-2026. Verificado el 24 ago. 2026 18:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.