Oficiālais kopsavilkums · English
Kas tiek iepirkts?
The Contracting Authority wants to purchase one 3 phase, 145 kV, 50 Hz, gas-insulated switchgear (GIS) Alternative gas, double busbar for substation Ølstykke (ØLS) and delivered on Energinet’s site, ready for operation. The GIS Switchgear will be installed in a new building - The supply consists of 2 line-feeder bays, 2 (two) transformer bays, 1 bus bar coupler bays, and 2 (two) metering bays.
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
The Contracting Authority wants to purchase one 3 phase, 145 kV, 50 Hz, gas-insulated switchgear (GIS) Alternative gas, double busbar for substation Ølstykke (ØLS) and delivered on Energinet’s site, ready for operation. The GIS Switchgear will be installed in a new building - The supply consists of 2 line-feeder bays, 2 (two) transformer bays, 1 bus bar coupler bays, and 2 (two) metering bays.
Bezmaksas
Saņemiet nākamos šīs nozares iepirkumus
Reizi nedēļā saņemiet e-pastu ar jauniem paziņojumiem, kas atbilst jūsu kritērijiem. Pirms bezmaksas brīdinājuma aktivizēšanas pārbaudiet vai mainiet kritērijus.
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 564575-2026. Pārbaudīts 2026. gada 24. aug. 18:05.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.