Offizielle Zusammenfassung · English
Was wird beschafft?
This specification sets out the requirements for refurbishment works to six-wheel (6x4) rigid tipper trucks, typically 26-tonne GVW, and haulage plant. The initial contract comprises 4 No. six-wheel (6x4) rigid tipper trucks, with provision for up to 3 No. additional units. The contract shall also include general steel fabrication repairs to Council-owned plant, together with maintenance and preventive works to Council-owned plant as instructed during the contract period. All works shall be carried out at the Contractor’s approved premises unless otherwise agreed in writing by the Council. The works shall include, but shall not be limited to: • Complete abrasive blasting of the tipper body interior and exterior, chassis, subframe, differentials, springs, mudguards, hydraulic components and
Quelle und Verlässlichkeit
Quelle: amtliche TED-Bekanntmachung 553329-2026, zuletzt geprüft am 21.08.2026, 20:07. Maßgeblich bleibt die Originalveröffentlichung.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.