Amtliche Zusammenfassung · English
Was wird beschafft?
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 5: Architect Led IDT for County Donegal - Lot 6: Engineer (Civil and Structural) / Project Manager Led IDT for County Donegal Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer / Project Manager Led IDT Services. Each framework agreement will be established with up to 5 economic operators.…
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 5: Architect Led IDT for County Donegal - Lot 6: Engineer (Civil and Structural) / Project Manager Led IDT for County Donegal Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer / Project Manager Led IDT Services. Each framework agreement will be established with up to 5 economic operators.…
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Bekanntmachung vergebener Aufträge Angezeigte Bekanntmachung
· TED 436743-2026
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 436743-2026. Geprüft am 23.08.2026, 07:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.