Sintesi ufficiale · English
Che cosa viene acquistato?
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 5: Architect Led IDT for County Donegal - Lot 6: Engineer (Civil and Structural) / Project Manager Led IDT for County Donegal Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer / Project Manager Led IDT Services. Each framework agreement will be established with up to 5 economic operators.…
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Establishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 5: Architect Led IDT for County Donegal - Lot 6: Engineer (Civil and Structural) / Project Manager Led IDT for County Donegal Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer / Project Manager Led IDT Services. Each framework agreement will be established with up to 5 economic operators.…
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 436743-2026. Verificato il 23 ago 2026, 07:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.