Geschlossen TED · Quelle · Sprache: English

Irland · Bauarbeiten

Amtlicher Titel · English

Restoration of Ulster Canal Phases 3.1 and 3.2 - Construction phase

Waterways Ireland_225 · Irland

Bekanntmachungen unter diesem Namen ansehen
Frist 19.06.2026 15:00 UTC+01:00
Geschätzter Wert35.000.000 EUR
Veröffentlicht06.05.2026
Amtliche Bekanntmachung öffnen ↗

Amtliche Zusammenfassung · English

Was wird beschafft?

Ulster Canal Restoration Phase 3 is a cross jurisdictional project with works in both Northern Ireland and Ireland. When complete, Ulster Canal Restoration Phase 3 will connect the navigations of the previously constructed phases of the Ulster Canal Restoration and provide a navigable link from the Erne Navigation via the restored Ulster Canal to Clones. This competition is for the procurement of a Construction Team in respect of Phases 3.1 and 3.2 only, which extends from Castle Saunderson to Gortnacarrow. The works consist largely of the following: • Construction of a new navigation arch at Wattlebridge • Construction of a new bridge at A3 Gortnacarrow • Local realignment of roads • Construction of a marina and lock chamber • Construction of accommodation bridge • construction of 300m of

Bekanntmachungsverlauf

Zeitlicher Ablauf des Vergabeverfahrens

Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.

Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.

  1. Auftragsbekanntmachung Aktuelle Bekanntmachung

    · TED 308921-2026

    Amtliche Bekanntmachung öffnen ↗

Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.

Quelle und Verlässlichkeit

TED · 308921-2026. Geprüft am 22.08.2026, 03:05.

Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.

Fehler per E-Mail melden