Dúnta TED · Foinse · Teanga: English

Éire · Oibreacha tógála

Teideal oifigiúil · English

Restoration of Ulster Canal Phases 3.1 and 3.2 - Construction phase

Waterways Ireland_225 · Éire

Féach ar fhógraí faoin ainm seo
Spriocdháta 19 Meith 2026 15:00 UTC+01:00
Luach measta35,000,000 EUR
Foilsithe6 Beal 2026
Oscail an fógra oifigiúil ↗

Achoimre oifigiúil · English

Cad atá á sholáthar?

Ulster Canal Restoration Phase 3 is a cross jurisdictional project with works in both Northern Ireland and Ireland. When complete, Ulster Canal Restoration Phase 3 will connect the navigations of the previously constructed phases of the Ulster Canal Restoration and provide a navigable link from the Erne Navigation via the restored Ulster Canal to Clones. This competition is for the procurement of a Construction Team in respect of Phases 3.1 and 3.2 only, which extends from Castle Saunderson to Gortnacarrow. The works consist largely of the following: • Construction of a new navigation arch at Wattlebridge • Construction of a new bridge at A3 Gortnacarrow • Local realignment of roads • Construction of a marina and lock chamber • Construction of accommodation bridge • construction of 300m of

Stair na bhfógraí

Amlíne an tsoláthair

Lean na príomhchéimeanna agus na nuashonruithe a bhaineann leis an nós imeachta soláthair seo.

Níor sainaithníodh aon fhógra gaolmhar eile go fóill.

  1. Fógra comórtais Fógra reatha

    · TED 308921-2026

    Oscail an fógra oifigiúil ↗

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Foinse agus iontaofacht

TED · 308921-2026. Seiceáilte ar 22 Lún 2026 03:05.

Tá na sonraí athstruchtúrtha chun iad a léamh níos éasca. Is iad an fógra oifigiúil agus na doiciméid soláthair a bhíonn i réim i gcónaí.

Tuairiscigh earráid trí ríomhphost