The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network.…
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network.…
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 705206-2026. Kontrollerad 13 okt. 2026 11:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.