Resumo oficial · English
O que está a ser adquirido?
The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network.…
Tradução automática indicativa. O resumo oficial continua a ser a referência.
Resumo oficial · English
The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network.…
Histórico do anúncio
Cronologia do procedimento de contratação pública
Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.
Fonte e fiabilidade
TED · 705206-2026. Verificado em 13 de out de 2026 11:05.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.